6.6: Instructor Notes / Evaluation Criteria
- Page ID
- 52123
\( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)
\( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)
\( \newcommand{\dsum}{\displaystyle\sum\limits} \)
\( \newcommand{\dint}{\displaystyle\int\limits} \)
\( \newcommand{\dlim}{\displaystyle\lim\limits} \)
\( \newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\)
( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\)
\( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\)
\( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\)
\( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\)
\( \newcommand{\Span}{\mathrm{span}}\)
\( \newcommand{\id}{\mathrm{id}}\)
\( \newcommand{\Span}{\mathrm{span}}\)
\( \newcommand{\kernel}{\mathrm{null}\,}\)
\( \newcommand{\range}{\mathrm{range}\,}\)
\( \newcommand{\RealPart}{\mathrm{Re}}\)
\( \newcommand{\ImaginaryPart}{\mathrm{Im}}\)
\( \newcommand{\Argument}{\mathrm{Arg}}\)
\( \newcommand{\norm}[1]{\| #1 \|}\)
\( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\)
\( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\AA}{\unicode[.8,0]{x212B}}\)
\( \newcommand{\vectorA}[1]{\vec{#1}} % arrow\)
\( \newcommand{\vectorAt}[1]{\vec{\text{#1}}} % arrow\)
\( \newcommand{\vectorB}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)
\( \newcommand{\vectorC}[1]{\textbf{#1}} \)
\( \newcommand{\vectorD}[1]{\overrightarrow{#1}} \)
\( \newcommand{\vectorDt}[1]{\overrightarrow{\text{#1}}} \)
\( \newcommand{\vectE}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash{\mathbf {#1}}}} \)
\( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)
\(\newcommand{\longvect}{\overrightarrow}\)
\( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)
\(\newcommand{\ket}[1]{\left| #1 \right>}\)
\(\newcommand{\bra}[1]{\left< #1 \right|}\)
\(\newcommand{\braket}[2]{\left< #1 \vphantom{#2} \right| \left. #2 \vphantom{#1} \right>}\)
\(\newcommand{\braopket}[3]{\left< #1 \vphantom{#2}\vphantom{#3} \right| #2 \vphantom{#1}\vphantom{#3} \left| #3 \vphantom{#1}\vphantom{#2} \right>}\)
\(\newcommand{\qmvec}[1]{\mathbf{\vec{#1}}}\)
\(\newcommand{\op}[1]{\hat{\mathbf{#1}}}\)
\(\newcommand{\expect}[1]{\langle #1 \rangle}\)
\(\newcommand{\dfn}[1]{\emph{\textbf{#1}}}\)
Chapter 4 – Instructor Notes & Evaluation Criteria
This milestone assesses the student team's ability to anticipate, structure, and prepare for uncertainty in a complex implementation environment. Risk and control management are indicators of mature project thinking and should demonstrate clarity, defensibility, and alignment with earlier planning efforts.
Evaluation Scope
Expected submissions:
- Risk Register (scored, categorized, with assigned owners)
- Risk Matrix or Heat Map (visual representation of priority)
- Control Plan for all five pillars: Scope, Schedule, Budget, Quality, and Team
- Risk and Control Narrative summarizing strategy and control philosophy
- Optional: Stakeholder Presentation Slides and Escalation Protocol
Evaluation Criteria (Suggested)
- Clarity and Professionalism (20%)
- Are documents labeled, well-structured, and easy to navigate?
- Are risk and control data points clearly explained?
- Are visualizations legible and appropriate?
- Risk Structure and Depth (25%)
- Are risks thoughtful and tailored to C-Bay’s franchise context?
- Do scores reflect genuine differentiation and insight?
- Are risk owners logically assigned?
- Control Design and Coverage (25%)
- Are controls specific, actionable, and matched to key risks?
- Do controls include ownership, frequency, and escalation logic?
- Is each pillar adequately addressed?
- Narrative and Leadership Framing (20%)
- Does the team communicate purpose and strategy—not just documentation?
- Are trade-offs, assumptions, or priorities clearly explained?
- Would this narrative instill confidence in a stakeholder?
- Reflection and Team Learning (10%)
- Do reflections show individual and collective insight?
- Does the team address what they would improve, reinforce, or rethink?
Instructor Notes
Look for depth over quantity. A short but thoughtful Risk Register, paired with a well-written narrative and practical control plan, is more valuable than a bloated set of files.
Strong teams will:
- Use simple tools effectively
- Frame their control systems as proactive leadership, not reactive compliance
- Show signs of team growth in the way they approached and evaluated uncertainty
This milestone offers an excellent coaching opportunity for strategic thinking, systems awareness, and stakeholder empathy.