7.4: Submission Checklist
- Page ID
- 52247
\( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)
\( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)
\( \newcommand{\dsum}{\displaystyle\sum\limits} \)
\( \newcommand{\dint}{\displaystyle\int\limits} \)
\( \newcommand{\dlim}{\displaystyle\lim\limits} \)
\( \newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\)
( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\)
\( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\)
\( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\)
\( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\)
\( \newcommand{\Span}{\mathrm{span}}\)
\( \newcommand{\id}{\mathrm{id}}\)
\( \newcommand{\Span}{\mathrm{span}}\)
\( \newcommand{\kernel}{\mathrm{null}\,}\)
\( \newcommand{\range}{\mathrm{range}\,}\)
\( \newcommand{\RealPart}{\mathrm{Re}}\)
\( \newcommand{\ImaginaryPart}{\mathrm{Im}}\)
\( \newcommand{\Argument}{\mathrm{Arg}}\)
\( \newcommand{\norm}[1]{\| #1 \|}\)
\( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\)
\( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\AA}{\unicode[.8,0]{x212B}}\)
\( \newcommand{\vectorA}[1]{\vec{#1}} % arrow\)
\( \newcommand{\vectorAt}[1]{\vec{\text{#1}}} % arrow\)
\( \newcommand{\vectorB}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)
\( \newcommand{\vectorC}[1]{\textbf{#1}} \)
\( \newcommand{\vectorD}[1]{\overrightarrow{#1}} \)
\( \newcommand{\vectorDt}[1]{\overrightarrow{\text{#1}}} \)
\( \newcommand{\vectE}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash{\mathbf {#1}}}} \)
\( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)
\(\newcommand{\longvect}{\overrightarrow}\)
\( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)
\(\newcommand{\ket}[1]{\left| #1 \right>}\)
\(\newcommand{\bra}[1]{\left< #1 \right|}\)
\(\newcommand{\braket}[2]{\left< #1 \vphantom{#2} \right| \left. #2 \vphantom{#1} \right>}\)
\(\newcommand{\braopket}[3]{\left< #1 \vphantom{#2}\vphantom{#3} \right| #2 \vphantom{#1}\vphantom{#3} \left| #3 \vphantom{#1}\vphantom{#2} \right>}\)
\(\newcommand{\qmvec}[1]{\mathbf{\vec{#1}}}\)
\(\newcommand{\op}[1]{\hat{\mathbf{#1}}}\)
\(\newcommand{\expect}[1]{\langle #1 \rangle}\)
\(\newcommand{\dfn}[1]{\emph{\textbf{#1}}}\)
Purpose of This Checklist
This checklist serves as a final validation guide for your submission. It ensures that all deliverables are:
- Fully developed and populated with meaningful, traceable data
- Consistent with your previous milestones (especially Milestone 4)
- Designed for actual execution, not just academic completion
- Usable by a project manager, stakeholder, or QA lead in a real project environment
This checklist also reinforces professional readiness—your submission should function as a leadership toolkit, not just a set of templates.
SECTION 1 – Budget Tracking Log
| ✔ | Criteria |
|---|---|
| ☐ | All cost categories from Milestone 4 are included (labor, non-labor, contingency if used) |
| ☐ | Each category includes: Planned Budget, Actual to Date, Remaining Budget, % Burned |
| ☐ | Status field clearly flags On Track / At Risk / Over Budget |
| ☐ | Notes column is used for updates, source references, or explanations |
| ☐ | All formulas (Remaining, % Burned) are functioning and correct |
| ☐ | Formatting aids readability (tables aligned, currency symbols used, color coding optional) |
SECTION 2 – Variance Analysis Table
| ✔ | Criteria |
|---|---|
| ☐ | Planned vs. Actual spend shown side-by-side per category |
| ☐ | Variance ($ and %) calculated and displayed |
| ☐ | Each variance includes a Direction: Over / Under / On Target |
| ☐ | Root causes or triggers are described briefly and clearly |
| ☐ | Action Taken field describes how issue was resolved or mitigated |
| ☐ | Language used is clear, professional, and execution-oriented |
SECTION 3 – QA Acceptance Criteria Checklist
| ✔ | Criteria |
|---|---|
| ☐ | Includes at least 3–5 major deliverables from project scope or WBS |
| ☐ | Each deliverable has clearly stated SMART quality criteria |
| ☐ | QA method is defined (e.g., peer review, test, walkthrough, approval) |
| ☐ | Reviewer/approver roles are specified (internal or client-facing) |
| ☐ | Status field shows current acceptance state (Pending, Accepted, Rework Needed) |
| ☐ | Due dates and tracking notes included where applicable |
| ☐ | Matches terminology from previous milestones |
SECTION 4 – Defect Log / QA Tracker
| ✔ | Criteria |
|---|---|
| ☐ | Each defect or issue is uniquely identified (e.g., DEF-001) |
| ☐ | Deliverable or scope area is referenced |
| ☐ | Severity is classified (High, Medium, Low) |
| ☐ | Owner is assigned for follow-up |
| ☐ | Status column used consistently (Open, In Progress, Resolved, Deferred) |
| ☐ | Resolution date and actions taken are documented |
| ☐ | Optional: Sorting/filtering enabled, visual aids (color codes, icons) used effectively |
SECTION 5 – Quality Escalation Process (Optional but Recommended)
| ✔ | Criteria |
|---|---|
| ☐ | Triggers for escalation are clearly defined (e.g., repeated rejections, unresolved issue) |
| ☐ | Escalation levels shown with decision owners (Team → PM → Sponsor) |
| ☐ | Timeline expectations for each escalation level included |
| ☐ | Matrix, table, or flow diagram is clearly structured and easy to follow |
| ☐ | Linked to quality tracker (or references it in application) |
| ☐ | Scenario examples (even hypothetical) are used to validate its function |
FORMATTING & PRESENTATION
| ✔ | Criteria |
|---|---|
| ☐ | All components are labeled clearly and presented in professional layout |
| ☐ | Consistent headers, fonts, and alignment used throughout |
| ☐ | Tables are cleanly structured (no broken columns or unclear labels) |
| ☐ | No placeholder text or empty fields remain |
| ☐ | Units (e.g., $USD, hours, %) are used consistently |
| ☐ | Document includes page numbers, title section, and version/date footer (optional) |
SUBMISSION LOGISTICS
| ✔ | Criteria |
|---|---|
| ☐ | File type submitted as PDF, DOCX, XLSX, or Google Doc/Sheet (as assigned) |
| ☐ | File name uses correct format: Milestone6_BudgetAndQualityControls_TeamName |
| ☐ | All components submitted together or in clearly labeled attachments |
| ☐ | Submitted to the correct platform/location by the deadline |
| ☐ | All team member names listed on title page or first section |
Final Self-Check Questions
- Would your QA Tracker be helpful during a stakeholder review or product demo?
- Could your Budget Tracking Log support a conversation about financial health with your sponsor?
- Are all deliverables and budget categories traceable to Milestones 3–5?
- If asked to explain one over-budget item or quality escalation, would your documentation support that answer?
- Would your tools still be usable by someone taking over your project midstream?