8.6: Instructor Notes / Evaluation Criteria

  • Page ID
    52164
  • \( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)

    \( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)

    \( \newcommand{\dsum}{\displaystyle\sum\limits} \)

    \( \newcommand{\dint}{\displaystyle\int\limits} \)

    \( \newcommand{\dlim}{\displaystyle\lim\limits} \)

    \( \newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\)

    ( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\)

    \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\)

    \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\)

    \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\)

    \( \newcommand{\Span}{\mathrm{span}}\)

    \( \newcommand{\id}{\mathrm{id}}\)

    \( \newcommand{\Span}{\mathrm{span}}\)

    \( \newcommand{\kernel}{\mathrm{null}\,}\)

    \( \newcommand{\range}{\mathrm{range}\,}\)

    \( \newcommand{\RealPart}{\mathrm{Re}}\)

    \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\)

    \( \newcommand{\Argument}{\mathrm{Arg}}\)

    \( \newcommand{\norm}[1]{\| #1 \|}\)

    \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\)

    \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\AA}{\unicode[.8,0]{x212B}}\)

    \( \newcommand{\vectorA}[1]{\vec{#1}}      % arrow\)

    \( \newcommand{\vectorAt}[1]{\vec{\text{#1}}}      % arrow\)

    \( \newcommand{\vectorB}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)

    \( \newcommand{\vectorC}[1]{\textbf{#1}} \)

    \( \newcommand{\vectorD}[1]{\overrightarrow{#1}} \)

    \( \newcommand{\vectorDt}[1]{\overrightarrow{\text{#1}}} \)

    \( \newcommand{\vectE}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash{\mathbf {#1}}}} \)

    \( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)

    \(\newcommand{\longvect}{\overrightarrow}\)

    \( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)

    \(\newcommand{\avec}{\mathbf a}\) \(\newcommand{\bvec}{\mathbf b}\) \(\newcommand{\cvec}{\mathbf c}\) \(\newcommand{\dvec}{\mathbf d}\) \(\newcommand{\dtil}{\widetilde{\mathbf d}}\) \(\newcommand{\evec}{\mathbf e}\) \(\newcommand{\fvec}{\mathbf f}\) \(\newcommand{\nvec}{\mathbf n}\) \(\newcommand{\pvec}{\mathbf p}\) \(\newcommand{\qvec}{\mathbf q}\) \(\newcommand{\svec}{\mathbf s}\) \(\newcommand{\tvec}{\mathbf t}\) \(\newcommand{\uvec}{\mathbf u}\) \(\newcommand{\vvec}{\mathbf v}\) \(\newcommand{\wvec}{\mathbf w}\) \(\newcommand{\xvec}{\mathbf x}\) \(\newcommand{\yvec}{\mathbf y}\) \(\newcommand{\zvec}{\mathbf z}\) \(\newcommand{\rvec}{\mathbf r}\) \(\newcommand{\mvec}{\mathbf m}\) \(\newcommand{\zerovec}{\mathbf 0}\) \(\newcommand{\onevec}{\mathbf 1}\) \(\newcommand{\real}{\mathbb R}\) \(\newcommand{\twovec}[2]{\left[\begin{array}{r}#1 \\ #2 \end{array}\right]}\) \(\newcommand{\ctwovec}[2]{\left[\begin{array}{c}#1 \\ #2 \end{array}\right]}\) \(\newcommand{\threevec}[3]{\left[\begin{array}{r}#1 \\ #2 \\ #3 \end{array}\right]}\) \(\newcommand{\cthreevec}[3]{\left[\begin{array}{c}#1 \\ #2 \\ #3 \end{array}\right]}\) \(\newcommand{\fourvec}[4]{\left[\begin{array}{r}#1 \\ #2 \\ #3 \\ #4 \end{array}\right]}\) \(\newcommand{\cfourvec}[4]{\left[\begin{array}{c}#1 \\ #2 \\ #3 \\ #4 \end{array}\right]}\) \(\newcommand{\fivevec}[5]{\left[\begin{array}{r}#1 \\ #2 \\ #3 \\ #4 \\ #5 \\ \end{array}\right]}\) \(\newcommand{\cfivevec}[5]{\left[\begin{array}{c}#1 \\ #2 \\ #3 \\ #4 \\ #5 \\ \end{array}\right]}\) \(\newcommand{\mattwo}[4]{\left[\begin{array}{rr}#1 \amp #2 \\ #3 \amp #4 \\ \end{array}\right]}\) \(\newcommand{\laspan}[1]{\text{Span}\{#1\}}\) \(\newcommand{\bcal}{\cal B}\) \(\newcommand{\ccal}{\cal C}\) \(\newcommand{\scal}{\cal S}\) \(\newcommand{\wcal}{\cal W}\) \(\newcommand{\ecal}{\cal E}\) \(\newcommand{\coords}[2]{\left\{#1\right\}_{#2}}\) \(\newcommand{\gray}[1]{\color{gray}{#1}}\) \(\newcommand{\lgray}[1]{\color{lightgray}{#1}}\) \(\newcommand{\rank}{\operatorname{rank}}\) \(\newcommand{\row}{\text{Row}}\) \(\newcommand{\col}{\text{Col}}\) \(\renewcommand{\row}{\text{Row}}\) \(\newcommand{\nul}{\text{Nul}}\) \(\newcommand{\var}{\text{Var}}\) \(\newcommand{\corr}{\text{corr}}\) \(\newcommand{\len}[1]{\left|#1\right|}\) \(\newcommand{\bbar}{\overline{\bvec}}\) \(\newcommand{\bhat}{\widehat{\bvec}}\) \(\newcommand{\bperp}{\bvec^\perp}\) \(\newcommand{\xhat}{\widehat{\xvec}}\) \(\newcommand{\vhat}{\widehat{\vvec}}\) \(\newcommand{\uhat}{\widehat{\uvec}}\) \(\newcommand{\what}{\widehat{\wvec}}\) \(\newcommand{\Sighat}{\widehat{\Sigma}}\) \(\newcommand{\lt}{<}\) \(\newcommand{\gt}{>}\) \(\newcommand{\amp}{&}\) \(\definecolor{fillinmathshade}{gray}{0.9}\)

    How to Evaluate Student Closeout Deliverables (Weeks 1–6 Only)

    Closing the NovaMed project at Week 6 provides a realistic simulation of early project termination—one of the most complex scenarios a project manager may face. Students must demonstrate the ability to:

    • Analyze partial, inconsistent, incomplete deliverables
    • Interpret Earned Value trends
    • Apply contractual requirements
    • Make defensible acceptance decisions
    • Evaluate vendor performance objectively
    • Communicate decisions with clarity and authority
    • Document the project clearly and professionally

    The following criteria will help instructors evaluate the Chapter 6 submissions consistently and fairly.

    Overview for Instructors

    • Students submit the following key artifacts:
    • Acceptance Matrix (Partial)
    • Documentation Verification Checklist
    • Earned Value Final Summary
    • Defect/Issue Disposition Log
    • Vendor Performance Evaluation
    • Final Acceptance Memo
    • Closeout Summary Report
    • Final Reflection
      • These must be evaluated not just for content accuracy, but also for:
        • Correct interpretation of project documents
        • Professional communication standards
        • Logical reasoning and defensible decisions
        • Alignment with PM best practices

    Evaluation Categories (Weighted Rubric) - Suggested

    This rubric is recommended for standardizing evaluation across instructors.

    Acceptance Matrix Quality (20%)

    Evaluate whether the student:

    • Correctly interpreted SOW milestones
    • Identified which deliverables were incomplete (all)
    • Documented partial work accurately
    • Classified acceptance status correctly:
      • Accept
      • Conditional Accept
      • Reject
      • Cannot Evaluate
    • Provided evidence for decisions based on Weeks 1–

    High Score Characteristics:

    • Student references specific criteria from SOW/SRS/HLDD
    • Clear, justified acceptance decisions
    • Matrix is organized, readable, and internally consistent

    Documentation Verification Checklist (10%)

    Evaluate whether the student:

    • Correctly classified documentation as Partial / Missing / Not Delivered
    • Identified specific gaps (e.g., no integration test results, no manuals)
    • Noted inconsistencies between documentation and progress
    • Included brief but accurate reasoning

    High Score Characteristics:

    • Well-structured checklist
    • Shows awareness of missing artifacts
    • Connects documentation gaps to quality or acceptance risks

    Earned Value Analysis (15%)

    Students should:

    • Calculate accurate SPI/CPI for Weeks 1–6
    • Note declining performance trends
    • Identify that the project was behind schedule and over cost
    • Provide a final interpretation:
      • CPI < 1.0
      • SPI < 1.0
      • Negative trajectory

    High Score Characteristics:

    • EVM table is correct
    • Trend commentary is insightful
    • Student uses EAC/VAC appropriately (even though project halted early)
    • Comments show understanding of early performance indicators

    Defect/Issue Disposition Log (10%)

    Evaluate whether the student:

    • Captured all issues from memos (Week 4 defects, Week 6 integration failures, staffing problems, reporting issues, HLDD delays)
    • Classified severity accurately
    • Provided reasonable dispositions (Fix Now / Defer / Cannot Evaluate)
    • Understood downstream impact of critical issues

    High Score Characteristics:

    • Clear categorization
    • Accurate defect severity level
    • Reasonable, defensible disposition choices

    Vendor Performance Evaluation (15%)

    Students must assess WinSoft fairly using:

    • Schedule performance
    • Cost performance (CPI)
    • Reporting compliance
    • Staffing stability
    • Quality of deliverables
    • Responsiveness and transparency
    • Adherence to Contract & SOW

    High Score Characteristics:

    • Evaluation is data-driven (not emotional)
    • References contract obligations
    • Balanced strengths and weaknesses
    • Final vendor rating is justified

    Final Acceptance Memo (15%)

    Students must write a clear, professional acceptance decision:

    • Acceptance or non-acceptance (typically non-acceptance)
    • Reasons tied to evidence
    • Contractual references
    • Clear conditions or next steps
    • Appropriate professional tone

    High Score Characteristics:

    • Executive-level tone
    • Clear logic
    • Contractually grounded
    • No informal or emotional language

    Closeout Summary Report (10%)

    This is the “capstone” deliverable. Evaluate:

    • Structure and clarity
    • Completeness of required sections
    • Accuracy in summarizing 6-week progress
    • Insight into root causes
    • Quality of recommendations
    • Internal consistency across all documents

    High Score Characteristics:

    • Reads like a real PMO closeout report
    • Contains data-driven conclusions
    • Demonstrates mature project leadership judgment

    Instructor Notes for Evaluating Judgment

    Execution-phase and closeout work rely heavily on judgment.
    Here are common red flags and strong indicators of mastery.

    Common Student Errors (Red Flags)

    • Over-accepting items that clearly fail SOW criteria
    • Failing to reference SOW/Contract clauses
    • Acceptance decisions based on hope rather than evidence
    • Ignoring Earned Value trends
    • Underestimating the impact of the HLDD delay
    • Ignoring staffing violations (contract breach)
    • Overlooking serious defects
    • Writing acceptance memos with vague or emotional tone
    • Confusing “deliverable exists” with “deliverable meets criteria”

    Indicators of Strong Mastery

    • Student identifies patterns across memos (e.g., consistent underperformance)
    • Student cross-links SOW + Contract + Reporting Guidelines
    • Final Acceptance Memo is written at a leadership-ready level
    • Closeout Report shows systems thinking
    • Earned Value narrative shows deep understanding
    • Defect disposition aligns with severity and impact
    • Vendor evaluation uses qualitative + quantitative evidence
    • Reflection shows genuine ownership of learning

    Recommended Scoring Grid (100 Points Total)

    Recommended Scoring Card
    Category Points
    Acceptance Matrix 20
    Documentation Checklist 10
    Earned Value Summary 15
    Defect/Issue Log 10
    Vendor Evaluation 15
    Final Acceptance Memo 15
    Closeout Report 10
    Final Reflection 5

    Instructor Teaching Notes

    • Encourage students to treat Week 6 as a hard stop.
    • Emphasize that closing a failing or incomplete project is a real skill.
    • Prompt them to defend decisions with SOW/Contract citations.
    • Highlight that Earned Value provides objective evidence even when memos are subjective or incomplete.
    • Reinforce that quality documentation is part of the acceptance criteria.
    • Remind them that tone and professionalism matter just as much as analysis.

    Final Note for Instructors

    Closing a partly completed project reveals a student’s capacity to:

    • Lead with structure
    • Think critically under ambiguity
    • Communicate with authority
    • Protect organizational interests
    • Transform scattered data into aligned decisions

    This chapter is not just the end of NovaMed — it is the measure of their professional readiness. 


    8.6: Instructor Notes / Evaluation Criteria is shared under a CC BY 4.0 license and was authored, remixed, and/or curated by LibreTexts.