10.2: Systems Development Life Cycle (SDLC) Model

  • Page ID
    22785
  • \( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)

    \( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)

    \( \newcommand{\id}{\mathrm{id}}\) \( \newcommand{\Span}{\mathrm{span}}\)

    ( \newcommand{\kernel}{\mathrm{null}\,}\) \( \newcommand{\range}{\mathrm{range}\,}\)

    \( \newcommand{\RealPart}{\mathrm{Re}}\) \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\)

    \( \newcommand{\Argument}{\mathrm{Arg}}\) \( \newcommand{\norm}[1]{\| #1 \|}\)

    \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\)

    \( \newcommand{\Span}{\mathrm{span}}\)

    \( \newcommand{\id}{\mathrm{id}}\)

    \( \newcommand{\Span}{\mathrm{span}}\)

    \( \newcommand{\kernel}{\mathrm{null}\,}\)

    \( \newcommand{\range}{\mathrm{range}\,}\)

    \( \newcommand{\RealPart}{\mathrm{Re}}\)

    \( \newcommand{\ImaginaryPart}{\mathrm{Im}}\)

    \( \newcommand{\Argument}{\mathrm{Arg}}\)

    \( \newcommand{\norm}[1]{\| #1 \|}\)

    \( \newcommand{\inner}[2]{\langle #1, #2 \rangle}\)

    \( \newcommand{\Span}{\mathrm{span}}\) \( \newcommand{\AA}{\unicode[.8,0]{x212B}}\)

    \( \newcommand{\vectorA}[1]{\vec{#1}}      % arrow\)

    \( \newcommand{\vectorAt}[1]{\vec{\text{#1}}}      % arrow\)

    \( \newcommand{\vectorB}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)

    \( \newcommand{\vectorC}[1]{\textbf{#1}} \)

    \( \newcommand{\vectorD}[1]{\overrightarrow{#1}} \)

    \( \newcommand{\vectorDt}[1]{\overrightarrow{\text{#1}}} \)

    \( \newcommand{\vectE}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash{\mathbf {#1}}}} \)

    \( \newcommand{\vecs}[1]{\overset { \scriptstyle \rightharpoonup} {\mathbf{#1}} } \)

    \( \newcommand{\vecd}[1]{\overset{-\!-\!\rightharpoonup}{\vphantom{a}\smash {#1}}} \)

    Imagine you have been tasked with creating a new model of a car. Where would you start? You could design cool features and then jump right into building it. But what if some pieces don't work together? What if the target customer wants totally different features? A lot of research has been done in avoiding these and other problems and the solution is called the Systems Developement Life Cycle or SDLC.

    SDLC was first developed in the 1960s to manage the large projects associated with corporate systems running on mainframes. It is a very structured process designed to manage large projects with many people's efforts, including technical, business, support professionals. These projects are often costly to build, and they have a large impact on the organization. A failed project or an incorrect business decision to pick a wrong project to fund can be a business or financial catastrophe for an organization.

    SDLC is a model defining a process of a set of phases for planning, analysis, design, implementation, maintenance. Chapter 1 discusses that an information system (IS) includes hardware, software, database, networking, process, and people. SDLC has been used often to manage an IS project that may include one, some, or all of the elements of an IS. Let’s walk through each of the five phases of an SDLC as depicted in Figure \(\PageIndex{1}\): 

    Five phases with an arrow pointing to the next phase starting with Planning, Analysis, Design, Implementation, Maintenance
    Figure \(\PageIndex{1}\):  Software Development Lifecycle Model. Image by Ly-Huong Pham, Ph.D. is licensed under CC BY NC
    1. Planning. In this phase, a request is initiated by someone who acts as a sponsor for this idea. A small team is assembled to conduct a preliminary assessment of the request's merit and feasibility. The objectives of this phase are:
    • To determine how the request fits with the company’s strategy or business goals.
    • To conduct a feasibility analysis, which includes an analysis of the technical feasibility (is it possible to create this?), the economic feasibility (can we afford to do this?), and the legal feasibility (are we allowed to do this?).
    • To recommend a go/no go for the request. If it is a go, then a concept proposal is also produced for management to approve.
    1. Analysis. Once the concept proposal is approved, the project is formalized with a new project team (including the previous phase). Using the concept proposal as the starting point, the project members work with different stakeholder groups to determine the new system's specific requirements. No programming or development is done in this step. The objectives of this phase are:
    • Identify and Interview key stakeholders.
    • Document key procedures
    • Develop the data requirements
    • To produce a system-requirements document as the result of this phase. This has the details to begin the design of the system.
    1. Design. Once the system requirements are approved, the team may be reconfigured to bring in more members. This phase aims for the project team to take the system requirements document created in the previous phase and develop the specific technical details required for the system. The objectives are:
    • Translate the business requirements into specific technical requirement
    • Design the user interface, database, data inputs and outputs, and reports
    • Produce a system-design document as the result of this phase. . This document will have everything a programmer will need to create the system.
    1. Implementation. Once a system design is approved, the software code finally gets written in the programming phase, and the development effort for other elements such as hardware also happens. The purpose is to create an initial working system. The objectives are:
    • Develop the software code, and other IS components. Using the system- design document as a guide, developers begin to code or develop all the IS project components.
    • Test the working system through a series of structured tests such as:
      • The first is a unit test, which tests individual parts of the code for errors or bugs.
      • Next is a system test, where the system's different components are tested to ensure that they work together properly.
      • Finally, the user-acceptance test allows those that will be using the software to test the system to ensure that it meets their standards.
      • Iteratively test any fixes again to address any bugs, errors, or problems found during testing.
      • Train the users
      • Provide documentation
      • Perform necessary conversions from any previous system to the new system.
      • Produce, as a result, the initial working system that meets the requirements laid out in the analysis phase and the design developed in the design phase.
    1. Maintenance. This phase takes place once the implementation phase is complete. In this phase, the system must have a structured support process in place to:
    • Report bugs
    • Deploy bug fixes
    • Accept requests for new features
    • Evaluate the priorities of reported bugs or requested features to be implemented
    • Identify a predictable and regular schedule to release system updates and perform backups.
    • Dispose of data and anything else that is no longer needed

    Organizations can combine or sub-divide these phases to fit their needs. For example, instead of one phase, Planning, an organization can choose to have two phases: Initiation, Concept; or splitting the implementation into two phases: implementation and testing.

    Have a listen to this 5 minute video that introduces and reviews the multiple phases of Software Application Development Lifecycle.

    Waterfall Model

    One specific SDLC-based model is the Waterfall model, and the name is often thought to be the same as SDLC. It is used to manage software projects as depicted in Figure \(\PageIndex{2}\) with five phases: Requirements, Design, Implement, Verification, and Maintenance. This model stresses that each phase must be completed before the next one can begin (hence the name waterfall). For example, changes to the requirements are not allowed once the implementation phase has begun, or changes must be sought and approved to a change process. They may require the project to restart from the requirement phase since new requirements need to be approved, which may cause the design to be revised before the implementation phase can begin.

     

    Five boxes with arrows pointing to the next phase.  The first box is labeled Requirements with an additional arrow to the text, Product requirement document.  The second box is labeled Design with an additional arrow to the text, Software architecture.  The third box is labeled Implementation with an additional arrow to the text, Software.  The next two boxes are Verification and Maintenance with no additional arrows.
    Figure \(\PageIndex{2}\): Waterfall Model of System Development. Image by Peter Kemp / Paul Smit is licensed CC BY 3.0
     

    The waterfall model's structure has been criticized for being quite rigid and causing teams to be risk-averse to avoid going back to previous phases. However, there are benefits to such a structure too. Some advantages and disadvantages of SDLC and Waterfall are:

    Advantages and Disadvantage of SDLC and Waterfall

    Advantages

    Disadvantages

    The robust process to control and track changes to minimize the number of risks can derail the project unknowingly.

    Take time to record everything, which leads to additional cost and time to the schedule.

    Standard and transparent processes help the management of large teams.

    Too much time spent attending meetings, seeking approval, etc. which lead to additional cost and time to the schedule.

    Documentation reduces the risks of losing personnel, easier to add people to the project.

    Some members do not like to spend time writing, leading to the additional time needed to complete a project.

    Easier to trace a problem in the system to its root whenever errors are found, even after the project is completed.

    It is difficult to incorporate changes or customers’ feedback since the project has to go back to one or more previous phases, leading teams to become risk-averse.

    Other models are developed over time to address these criticisms. We will discuss two other models: Rapid Application Development and Agile, as different approaches to SDLC.

    Rapid Application Development (RAD)

    Rapid application development (RAD) is a software development (or systems-development) methodology that focuses less on planning and incorporating changes on an ongoing basis. One alternative to heavyweight waterfall development is rapid application development (RAD), depicted in Figure \(\PageIndex{3}\). RAD emphasizes building a prototype quickly and iteratively based on user feedback instead of detailed specifications. After a brief planning phase, developers collaborate closely with users to shape the application. This allows faster iterations and accommodation of changing requirements compared to waterfall development. RAD works best for smaller, less complex applications rather than enterprise-wide systems. After several iterations of development, a final version is developed and implemented. Let’s walk through the four phases in the RAD model as depicted in Figure \(\PageIndex{3}\).

     

    The circle with the text Requirements Planning has an arrow to two circles, User design and constructions.  These two circles has arrows to indicate that it is an iterative phase, and an arrow to point the last circle Cut Over.
    Figure \(\PageIndex{3}\): Image Rapid Application Development Model is licensed Public domain.

     

    1. Requirements Planning. This phase is similar to the planning, analysis, and design phases of the SDLC.
    2. User Design. In this phase, the users' representatives work with the system analysts, designers, and programmers to interactively create the system's design. One technique for working with all of these various stakeholders is the Joint Application Development (JAD) session. A JAD session gets all relevant users who interact with the systems from different perspectives, other key stakeholders, including developers, to have a structured discussion about the system's design. The objectives are for users to understand and adopt the working model and for the developers to understand how the system needs to work from the user’s perspective to provide a positive user experience.
    3. Construction. In the construction phase, the tasks are similar to SDLC’s implementation phase. The developers continue to work interactively with the users to incorporate their feedback as they interact with the working model that is being developed. This is an interactive process, and changes can be made as developers are working on the program. This step is executed parallel with the User Design step in an iterative fashion until an acceptable version of the product is developed.
    4. Cutover. This step is similar to some of the SDLC implementation phase tasks. The system goes live or is fully deployed. All steps required to move from the previous state to using the new system are completed here.

    Compared to the SDLC or Waterfall model, the RAD methodology is much more compressed. Many of the SDLC steps are combined, and the focus is on user participation and iteration. This methodology is better suited for smaller projects and has the added advantage of giving users the ability to provide feedback throughout the process. SDLC requires more documentation and attention to detail and is well suited to large, resource-intensive projects. RAD is better suited for projects that are less resource-intensive and need to be developed quickly. Here are some of the advantages and disadvantages of RAD:

    Advantages and Disadvantage of RAD

    Advantages

    Disadvantages

    Increase quality due to the frequency of interacting with the users

    Risks of weak implementation of features that are not visible to the users, such as security

    Reduce risks of users’ refusal to accept the finished product

    Lack of control over the system changes due to a working version's fast turn-around to address users’ issues.

    Improve chances of on-time, on-budget completion as users update in real-time, avoiding surprises during development.

    Lack of design since changes are being put in the system might unknowingly affect other parts of the system.

    Increase interaction time between developers/experts and users

    Scarce resources as developers are tied up, which could slow down other projects.

    Best suited for small to medium size project teams

    Difficult to scale up to large teams

    Agile Development Methodologies

    Agile methodologies are a group of methodologies that utilize incremental changes focusing on quality and attention to detail. Each increment is released in a specified period of time (called a time box), creating a regular release schedule with particular objectives. While considered a separate methodology from RAD, they share some of the same principles: iterative development, user interaction, and changeability. The agile methodologies are based on the “Agile Manifesto,” first released in 2001.

    The characteristics of agile methods include:

    • small cross-functional teams that include development-team members and users;
    • daily status meetings to discuss the current state of the project;
    • short time-frame increments (from days to one or two weeks) for each change to be completed; and
    • At the end of each iteration, a working project is completed to demonstrate to the stakeholders.

    In essence, the Agile approach puts a higher value on tasks that promote interaction, build frequent working versions, customers/user collaboration, and quick response to change and less emphasis on processes and documentation. The agile methodologies' goal is to provide an iterative approach's flexibility while ensuring a quality product.

    There are a variety of models that are built using Agile methodologies. One such example is the Scrum development model.

    Scrum development model

    This model is suited for small teams who work to produce a set of features within fixed-time interactions, such as two- to four weeks, called sprints. Let’s walk through the four key elements of a Scrum model as depicted in Figure \(\PageIndex{4}\).

    Four images with an arrow pointing the next one, starting with Product backlog, Spring backlog, Sprint, and Working increment of the software.

The Spring image is consisted of a larger circle with the text 30 days, and a small circle with the text 24h

    Figure \(\PageIndex{4}\): The Scrum project management method. Image by Lakeworks is licensed CC BY-SA 4.0

    1. Product backlog. This is a detailed breakdown list of work to be done. All the work is prioritized based on criteria such as risks, dependencies, mission-critical, etc. Developers select their own tasks and self-organize to get the work done.
    2. Sprint backlog. This is a list of the work to be done in the next sprint.
    3. Sprint. This is a fixed time, such as 1-day, 2-weeks, or 4-weeks, as agreed by the team. A daily progress meeting is called a daily scrum, typically a short 10-15 minute meeting facilitated by a scrum master whose role is to remove roadblocks for the team.
    4. Working increment of the software. This is a working version that is incrementally built with the breakdown lists at the end of the sprints.

     

    Use Case:  Agile Methodology \(\PageIndex{1}\)

    ABC Company wanted to build a new customer portal for their website.  How should they use an agile development methodology?

    Solution

    First, the team was assembled including developers, testers, a product manager, and user experience designer. Next, the product manager met with stakeholders and created a prioritized product backlog of required features for the portal.

    The development team worked in 2 week sprints. Each sprint began with a planning session to select features to work on from the backlog. Developers then built these features collaboratively and testers performed continuous automated testing as code was written.

    At the end of each sprint, a working increment of the portal was demonstrated to stakeholders who provided feedback. Feedback was incorporated into the product backlog to improve subsequent sprints.

    After 5 sprints over 10 weeks, the initial customer portal was complete. It was launched as a beta version to gather additional user feedback for subsequent portal enhancement.

    This agile approach with short iterative cycles, continuous testing, and user feedback allowed ABC Company to develop the customer portal faster and with greater quality than using traditional waterfall development.

     

    Comparing Waterfall and Agile Methods

     

    Here is a table comparing and contrasting Waterfall and Agile software development methodologies:

    Comparing and contrasting Waterfall and Agile Methods
      Waterfall Agile
    Requirements Gathered upfront Evolve iteratively
    Design Upfront design Just-in-time design
    Documentation Extensive Working software over documentation
    User Feedback After development Continuous feedback
    Development Sequential phases Iterative sprints
    Testing After development Continuous testing
    Changes Changes cause rework Embraces change

     

    The table highlights the key differences:

    • Waterfall emphasizes upfront planning, documentation and sequenced development phases
    • Agile favors responding to change, user feedback, and iterative development

     

    Lean Methodology

    One last methodology we will discuss is a relatively new concept taken from the business bestseller The Lean Startup, by Eric Reis.

    3 big blue circles with the words build, measure and learn with arrows leading from build to measure to learn and back again to build. one smaller orange circle between each pair of blue circle with the words code, data, ideas

    Figure \(\PageIndex{5}\): The Lean Methodology. Image by Tejal Desai-Naik is licensed under CC BY-4.0

    This methodology focuses on taking an initial idea and developing a minimum viable product (MVP). The MVP is a working software application with just enough functionality to demonstrate the idea behind the project. Once the MVP is developed, it is given to potential users for review. Feedback on the MVP is generated in two forms: (1) direct observation and discussion with the users, and (2) usage statistics gathered from the software itself. Using these two forms of feedback, the team determines whether they should continue in the same direction or rethink the project's core idea, change the functions, or create a new MVP. This change in strategy is called a pivot. Several iterations of the MVP are developed, with new functions added each time based on the feedback, until a final product is completed.

    The biggest difference between the lean methodology and the other methodologies is that the system's full set of requirements is unknown when the project is launched. The method focuses on establishing whether a business is viable by launching a product at the same time as gaining feedback. As each iteration of the project is released, the statistics and feedback gathered are used to determine the requirements. The aim being to reduce business risk and have a refined product or solution with a ready-made client base. The lean methodology works best in an entrepreneurial environment where a company is interested in determining if their idea for a software application is worth developing.

     
    Sidebar: Dropbox - Lean startup success story

    Dropbox is one of the most well-known lean startup success stories. This popular file transfer service was designed to send files between users which are too big to be sent as email attachments. Dropbox now has over 500 million users worldwide but it started life as a minimum viable product in form of a 3-minute screencast video by founder and CEO Drew Houston showing consumers what Dropbox could do.

    It was targeted at a community of technology early adopters. Response to the video enabled Dropbox to test if there was demand for the product and, at the same time, capture an initial audience through a waiting list. The video helped drive subscribers so the dropbox team could begin the process of refining their product and align it with customer needs. In less than 18 months, Dropbox's list of registered users rose from 100,000 to more than 4 million!

    Budgeting and Cost Estimation

     When planning for a new software development project, estimating the overall budget and costs is an important first step. Organizations will want to factor in costs for elements such as:

    • Labor - this is often the biggest cost, including salaries for software engineers, developers, project managers, analysts, testers, UI/UX designers and more. The number of team members and their hourly rates drive labor costs.
    • Hardware/Infrastructure - any new servers, networks, hardware that may be needed, including cloud computing costs.
    • Software licenses - the cost of any software development tools, operating systems, databases or other software needed.
    • User training - the labor and material costs for training users on the new system.
    • Facilities - if new office space is required for the project team.

    These cost estimates are important for setting budgets to insure that sufficient resources are planned to avoid unplanned cost overruns.

    References:

    Manifesto for Agile Software Development (2001). Retrieved December 10, 2020, from http://agilemanifesto.org/

    The Lean Startup. Retrieved on December 9, 2020, from http://theleanstartup.com/


    This page titled 10.2: Systems Development Life Cycle (SDLC) Model is shared under a CC BY 3.0 license and was authored, remixed, and/or curated by Ly-Huong T. Pham and Tejal Desai-Naik (Evergreen Valley College) .